National BIM Library feedback points way to future - part one
We were delighted to have a number of experts from a range of companies at the forefront of BIM in the UK join us for the day. We brought together a balanced mix of architects, engineers, contractors and clients, to discuss how we can best serve the industry. The event was held on Tuesday 17 July 2012, and our findings were as set out below.
There were two main areas of discussion. Firstly, how can we support the industry from a technical content point of view? Secondly, how can we support the industry by providing additional functionality? Architect and NBS technical author Stefan Mordue summarises the findings from the content discussions, and - in part two of this article - Dr John Henderson, Software Development Director at RIBA Enterprises, will summarise the findings from the functionality side.
Technical content and BIM
Information over visual content
The overriding feedback was the importance of the 'information' contained within the object, rather than the visual aspect. With regards to generic objects, visual appearance only needs to be sufficient to identify the object within the model environment. As such, it should be overtly generic in appearance with a low level of graphic detail. When a generic object is replaced with a manufacturer's object then its level of visual detail should increase. In terms of its rendered appearance, simple block colours are preferred over material textures. This keeps the file size low and is sufficient for quick presentational renders, whereby more realistic visualisations are often undertaken in a specialist visualisation package by a different department, either in-house or outsourced.
Space planning
Participants suggested that in order to aid the designer at early conceptual stages and with space planning, real value could be gained from objects that relate to activity spaces, zones and circulation. We could begin to indicate spaces such as wheelchair turning zones and minimum dimensions needed in front of a lift. We could also show maintenance zones around plant equipment for example, not only in the horizontal but in the vertical plan, to really take advantage of 3D objects.
Where next?
So where next for the National BIM Library? For the library to be truly national then our content must reflect more than just building fabric content. There was a clear message that mechanical and electrical objects would be a beneficial addition to the current content, and are something that is currently lacking in the industry. In much the same way as NBS Create responds to different disciplines, so should the range of objects being offered on the National BIM Library. MEP content should not only contain common devices, but also incorporate plan symbols. Further sector-specific standard libraries such as healthcare could also be explored. If we use a bed as an example, then in addition to a domestic bed we could also cater for a hospital bed and its associated unique features. Further objects to consider would be lifts and escalators, and stairs - all applicable to the UK construction industry.
The out of the box structural objects were adequate for use, although they lacked the consistency and comprehensive property sets of National BIM Library objects. A possible quick win would be to develop these objects further.
Object versus template
Users stated that they would benefit from support on how to author content themselves by way of a content creation guide. In order for this to be successful, a standard dictionary of terms, property definitions and abbreviations - that transcends all BIM platforms - would need to be agreed upon, to allow everyone to create content to the same standard. General comments pointed towards a desire for NBS to produce 'standard property sets' and 'templates' rather than more objects. These template property definitions would be of real importance: not than just "big-IFC", but the definitions for a particular object. The combination of IFC properties, COBie properties and NBS added properties all need to be standardised for BIM objects.
There were concerns raised over the overall model size versus a comprehensive parameter set. Suggestions were made for parameters to reflect the RIBA stages of work and direct what should be filled out and when. Further parameters could also be added to include application-specific properties, such as cost indicators and certification, as well as operational parameters, such as cleaning regimes and manufacturers' requirements. There is also a real opportunity to add carbon data, such as embedded carbon and distances to site.
Don't get left behind. Learn how BIM objects and the National BIM Library can help manufacturers. Part two next month: National BIM Library feedback on technical content.
Author @StephenHamilNBS Dr Stephen Hamil is Director of Design and Innovation and Head of BIM at RIBA Enterprises. Read his blog at http://constructioncode.blogspot.com.
Request a call back from RIBA Insight|
For more information about RIBA Insight advertising and marketing solutions, please complete our short further information form.
RIBA Insight Monthly Briefing|
Sign up now for our FREE Monthly Briefing, featuring exclusive marketing advice, useful reports and the latest industry news.