RIBA Insight Monthly Briefing

How are specifications changing?

In October and November 2013 NBS conducted its annual Future of Specification survey to measure trends in the specification process. Jenny Dobson, market research co-ordinator at RIBA Enterprises outlines some of the key findings.

The construction industry has seen numerous changes over the years. The approaching deadline for using Building Information Modelling (BIM) in publicly-funded projects, increasing interest in 'soft landings', and the introduction of the 2013 version of the RIBA Plan of Work help ensure that it continues to face many more. At NBS we're keen to understand what effect these changes are having on specifications.

The NBS survey examined the whole specification process, both now and into the future. Results showed that specifiers must be flexible, with most (81%) needing to produce different types of specification for different types of project. Despite this – and in a change from 2012 – there has been a shift towards performance specifying, with three out of four respondents telling us that they needed to produce specifications of this type. There has also been an increase in the number of specifiers needing to produce proprietary specifications (specifications by product brand). Manufacturers' product information is vital to both of these types of specification.

How are specifications changing?

How and when are specifications written and modified?

Most respondents indicated that specifications were written and modified during the developed and technical design stages of the project timeline. However, a minority reported that the process is now starting earlier (in some cases during the strategic definition of the project) and the modification of these is continuing into the latter stages, including while the building is in use. In future we expect the writing of specifications in these early stages to become more commonplace.

Three-quarters of specifiers told us that they 're-used specifications that they'd written for other projects' and 66% that they 'copied and pasted from previous specifications'. Whilst both of these methods may be acceptable, they do present significant risks: are they accurate, is the information they contain up-to-date and do they reference the correct, current standards?

Despite this high level of re-use, more people told us that they are now writing their own specifications, either by collecting information from manufacturers and pulling it together, or writing it from scratch. More than half also told us that they ask manufacturers to write the specification for them, especially when they are producing performance specifications. Results suggest that specifiers consider the information provided by manufacturers essential.

Specification difficulties

Problems with specifications, especially in using them, were common. Fifty-two percent of respondents reported having had difficulties, caused by contradictions between the drawings and the specification. Of particular concern though, were the difficulties half (49%) had experienced with inaccurate or incomplete technical data. This could in part be a reflection of the re-use of specifications written for other projects, but is an issue that needs to be addressed. The quality of data is paramount, especially in the move towards BIM. Accurate, technically complete BIM objects are available from the NBS National BIM Library.

Specifications now and in the future

Given the difficulties experienced as a result of specifications and drawings contradicting one another, it is not surprising that 95% of respondents agreed that there 'should be a direct link between specification and drawing documents'. Such a link could also help address the issue of inaccurate or incomplete technical data. For instance, at NBS we have developed tools such as the NBS National BIM Library and NBS Plus that enable accurate, up-to-date manufacturer information to easily be included within the specification.

How are specifications changing?

The concept behind 'soft landings' is now understood by the built environment sector, with over three-quarters recognising the benefits to everyone of a specification that is updated throughout the life of the building. Furthermore, two-thirds of respondents (68%) agreed that 'a good specification accurately documents everything as built at the end of the project'.

There is a clear expectation that the future of specifications is digital. It is a future where the specification forms an integral part of the BIM model, will be distributed digitally and will include links to 2D and/or 3D CAD drawings. This is a future that we are helping to create now, by providing tools (like NBS Plus and the NBS National BIM Library) that enable greater collaboration, digital links and accurate high-quality data contained within BIM objects. The future will also see a continued need for environmental performance requirements, as well as lifetime specifications.

Read the full survey report.

 

Author Jenny Dobson is market research co-ordinator at RIBA Enterprises.

 

Back to top

Request a call back from RIBA Insight

For more information about RIBA Insight advertising and marketing solutions, please complete our short further information form.

Full details

What specifiers want

RIBA Insight Monthly Briefing

Sign up now for our FREE Monthly Briefing, featuring exclusive marketing advice, useful reports and the latest industry news.

Sign up now

Email this page to a friend

* Email this page to a friend

–